CASE STUDY

NEO Energy –P8 Well Reconnection Case Study

Petrex provided Project Management and Engineering support for P8 Well reconnection to the GP3 DCC Manifold including a valve tie in structure.

The support consisted of:
• Concept and FEED
• Scope of work preparation and tendering Management of valve and flexible flowline fabrication
• Management and verification of Subsea Installation Contractor design , fabrication and installation
• Technical representation onboard the DSV and FPSO during installation and commissioning
• Close out and as building

The work was completed in November 2021