P1 Flexible Installation Case Study

Petrex provided Project Management and Engineering support for P1 Well flexible, spools and orifice valve installation at the Dumbarton field for NEO Energy.

The support consisted of:

•Scope of work preparation

•Management and verification of Subsea Installation Contractor design , fabrication and installation

•Inspection and witnessing of testing for valve, spools and flexible

•Technical representation onboard the DSV and FPSO during installation and commissioning

•Close out and as building

The work was completed in April 2024

6” Diameter Rigid Spools

6” Diameter Replacement 50m length Flexible

Modified 6” Gate valve to include orifice setting and weep hole

Completed 6” Orifice Valve assembly

CASE STUDY CATEGORIES

LATEST NEWS
CASE STUDIES
AFFILIATION
CONTACT US

41 Albert Street
Aberdeen
AB25 1XU
UK

+44 (0)1224 452140

Email Us

Registered office: 41 Albert Street, Aberdeen, AB25 1XU, UK.
Registered in Scotland No. SC 714115. Vat No. 398 227 258