Petrex provided Project Management and Engineering support for P1 Well flexible, spools and orifice valve installation at the Dumbarton field for NEO Energy.
The support consisted of:
•Scope of work preparation
•Management and verification of Subsea Installation Contractor design , fabrication and installation
•Inspection and witnessing of testing for valve, spools and flexible
•Technical representation onboard the DSV and FPSO during installation and commissioning
•Close out and as building
The work was completed in April 2024

6” Diameter Rigid Spools

6” Diameter Replacement 50m length Flexible

Modified 6” Gate valve to include orifice setting and weep hole

Completed 6” Orifice Valve assembly